centering

(redirected from Falsework)
Also found in: Dictionary, Thesaurus, Medical, Encyclopedia, Wikipedia.
References in periodicals archive ?
We believe that the increase in generalization accuracy over time found in the present experiment is the consequence of a change in the falsework relationship between training stimulus information and the new skill.
This segment had consistently high percentages working on highway structures including noise barriers, highway guardrail systems, signs and signposts, salt storage buildings, pedestrian bridges, and form- and falsework.
In addition, the pipelines ran across, and at an angle, to the bridge deck, which caused even greater problems when carrying out the falsework erection.
Cast-in-place construction on falsework is considered a tried-and-true method, whereas the incremental launching of a nearly 126-ft wide precast structure was considered to be more risky.
Caltrans started the SAS span by constructing a complex structure of steel truss falsework to support the deck sections.
The closure will allow contractors to remove the wooden falsework used to construct the new southbound I-5 Willamette River Bridge.
One of these firms is RMD Kwikform in Aldridge, a leading supplier of formwork and falsework to the construction industry.
Concrete Inspection: 1) General knowledge of roadway construction practices; 2) thorough knowledge of foundation requirements; 3) knowledge of factors affecting pile foundations and the ways to determine the adequate piling support; 4) familiarity with the requirements for forms and falsework, placement of reinforcing steel, and erection of structural steel and precast concrete members; 5) knowledge of concrete materials and the design of concrete mixtures; 6) competency to inspect proportioning of concrete mixing, placing, finishing, and curing of structural concrete; 7) knowledge of structure layout; and 8) ability to inspect concrete prestressing.
For the construction of the pre-stressed concrete hollow boxes, three different building methods were used: the western foreland bridge was realized using the incremental launching method, for the superstructure on Saadiyat Island in the east, falsework served as a flat and even support, while the large spans in the middle bridge section are concreted by means of the balanced cantilever method.
today as contractors for the Oregon Department of Transportation continue building the Interstate 5 Willamette River Bridge falsework supports.
This failure redistributed the loads in the shoring system, and the remaining shoring towers in the first interior row of falsework beams on Bridge No.