work done

(redirected from Mechanical work)
Also found in: Wikipedia.
References in classic literature ?
They knitted worthless things; but, the mechanical work was a mechanical substitute for eating and drinking; the hands moved for the jaws and the digestive apparatus: if the bony fingers had been still, the stomachs would have been more famine-pinched.
Is not the selfish and even cruel aspect which belongs to our great mechanical works, to mills, railways, and machinery, the effect of the mercenary impulses which these works obey?
The participants of the meeting review the work pace and progress of the civil work, electrical and mechanical work of the project.
Civil work within the premises of the Depot was being given final touches and electrical and mechanical work by the Chinese contractor CR-NORINCO was also in full swing for timely finalising arrangements for receiving these coaches, he added.
Under the terms of the deals, off-plot mechanical work will be carried out by local contractor, Seeh Al Sarya Engineering at PDO oil fields at Fahud, Lekhwair, and Yibal, and by Galfar Engineering and Contracting at Qarn Alam.
Sinohydro Group of China is the prime contractor for civil works while a consortium of Voith Hydro of Germany and China has the contract for electrical and mechanical work packages.
Great location, chance to expand to any mechanical work shop.
12016 of the Code of Federal Regulations, which requires electrically powered equipment to be de-energized before any mechanical work is performed.
Permit approval is necessary for construction of new homes, additions to existing structures, remodeling projects greater than $5,000, storage sheds greater than 120 square feet, fences taller than eight feet, decks either attached to the building or 30 inches above ground, installation of furnaces and hot water heaters, and major electrical, plumbing, and mechanical work.
But after the mechanical work is done, one can switch over to another leader.
We are close to finishing the civil and mechanical work for the entire pipeline and will soon start dry runs to make it ready for gas transportation," said a company spokesperson.
The agency has also made $5 million in cuts to administrative departments, including $274 million from the CEO's office as well as deferring some construction work and putting off mechanical work on 20 older buses in the fleet.

Full browser ?